Categories
Fortinet Exam Dumps
fortinet nse4_fgt-6.4 dumps (pdf + vce)
fortinet nse4_fgt-6.2 dumps (pdf + vce)
fortinet nse5_faz-6.4 dumps (pdf + vce)
fortinet nse5_faz-6.2 dumps (pdf + vce)
fortinet nse5_fct-6.2 dumps (pdf + vce)
fortinet nse5_fmg-6.4 dumps (pdf + vce)
fortinet nse5_fmg-6.2 dumps (pdf + vce)
fortinet nse6_fml-6.2 dumps (pdf + vce)
fortinet nse6_fnc-8.5 dumps (pdf + vce)
fortinet nse7_efw-6.4 dumps (pdf + vce)
fortinet nse7_efw-6.2 dumps (pdf + vce)
fortinet nse7_sac-6.2 dumps (pdf + vce)
fortinet nse7_sdw-6.4 dumps (pdf + vce)
fortinet nse8_811 dumps (pdf + vce)
Tags
Tag: 642-611
Cisco 642-611 Study Guide With The All New Exam Questions Of Flydumps
Cisco 642-611 tests containing questions that cover all sides of tested subjects that help our members to be prepared and keep high level of professionalism.The main purpose of Cisco 642-611 exam is to provide high quality test that can secure and verify knowledge, give overview of question types and complexity that can be represented on real exam certification
Exam A
QUESTION 1
What is a benefit of CEF switching?
A. CEF supports IP source prefix-based switching using the FIB.
B. CEF uses less memory than fast switching uses.
C. CEF is less CPU intensive than fast switching is.
D. CEF provides Netflow statistics with minimum CPU overhead.
E. CEF allows multiple data planes to share a common control plane.
Correct Answer: C Section: (none) Explanation
Explanation/Reference:
QUESTION 2
What is a major drawback of using traditional IP routing over an ATM network when connecting multiple sites?
A. Each ATM switch in the path has to perform Layer 3 routing lookup.
B. ATM virtual circuits have to be established between the different sites.
C. There is high ATM management overhead between the ATM switch and the router at each site.
D. Each ATM switch has to be manually configured to participate in Layer 3 routing.
E. There is high PNNI overhead.
Correct Answer: B Section: (none) Explanation
Explanation/Reference:
QUESTION 3
Refer to the diagram. What problem can be caused by the second P router summarizing the loopback address of the egress PE router?
A. The first P router will be faced with a VPN label which it does not understand.
B. The second P router will be faced with a VPN label which it does not understand.
C. The egress PE router will not be able to establish a label switch path (LSP) to the ingress PE router.
D. A label switch path (LSP) will be established from the ingress PE router to the egress PE router, an event that is not desirable.
» Read more about: Cisco 642-611 Study Guide With The All New Exam Questions Of Flydumps »
Cisco 642-611 Exam – Free Supporting Cisco Data Center System Devices
Now,Flydumps has publised the new version of Cisco 642-611 exam dumps with new added exam questions.Also the latest Cisco 642-611 PDF and VCE dumps with VCE test engine for free download, and the new Cisco 642-611 practice tests ensure your exam 100% pass.Visit www.Flydumps.com to get more exam dumps!
Exam A
QUESTION 1
Which statement is true about the hardware requirements of MPLS?
A. Because you do not need to run a routing protocol on P-routers, they require less memory than routers supporting classic IP routing.
B. Because of the additional processing and memory requirements needed to build the LFIB, MPLS is only available on high end routers.
C. MPLS is available on low end routers, built their use is limited because of the additional processing and memory requirements needed to build the LFIB.
D. Because P-routers do not need to carry routes outside the MPLD domain, they require less memory than routers that support the same application using classic IP routing.
Correct Answer: C Section: (none) Explanation
Explanation/Reference:
QUESTION 2
If aggregation (summarization) were to be used on a network with ATM LSRs. What would result?
A. LSPs would be broken in two.
B. There would be extra LFIB entries.
C. The size of the LFIB table would increase.
D. There would be extra LIB entries
Correct Answer: A Section: (none) Explanation
Explanation/Reference:
QUESTION 3
What is true of MPLS TE?
A. Only the ingress LSR must see the entire topology of the network.
B. Every LSR needs additional information about links in the network, available resources, and constraints.
C. Every core router must be able to create an LSP tunnel on demand.
D. Both RSVP and CR-LDP are used in conjunction to establish traffic engineering (TE) tunnels and to propagate the labels.
Correct Answer: B Section: (none) Explanation
Explanation/Reference:
QUESTION 4
What is a major drawback of using traditional IP routing over an ATM network when connecting multiple sites?
A. Each ATM switch in the path has to perform Layer 3 routing lookup.
B. ATM virtual circuits have to be established between the different sites.
» Read more about: Cisco 642-611 Exam – Free Supporting Cisco Data Center System Devices »
Recent Posts
- Cisco CCNA 200-301 Exam Latest Questions And Perspectives
- Most Accurate And Most Likely Cisco 400-007 Questions Sharing
- New CCNP ENCOR 350-401 Exam Questions And Experience Sharing
- Latest CCNP and CCIE Collaboration Certification 350-801 Exam Questions Online
- Prepare For The 350-601 Exam New Insights And The Latest Exam Questions To Share
2023 Pass4itsure Cisco dumps
Cisco CCDA Dumps
- 200-901 dumps (PDF+VCE)
Cisco CCDE Dumps
- 400-007 dumps (PDF+VCE)
Cisco CCDP Dumps
- 300-910 Dumps (PDF+VCE)
- 300-915 Dumps (PDF+VCE)
- 300-920 Dumps (PDF+VCE)
- 350-901 Dumps (PDF+VCE)
Cisco CCIT Dumps
- 100-490 Dumps (PDF+VCE)
Cisco CCNA Dumps
- 200-301 Dumps (PDF+VCE)
Cisco CCNP Dumps
- 350-401 Dumps (PDF+VCE)
- 300-410 Dumps (PDF+VCE)
- 300-415 Dumps (PDF+VCE)
- 300-420 Dumps (PDF+VCE)
- 300-425 Dumps (PDF+VCE)
- 300-430 Dumps (PDF+VCE)
- 300-435 Dumps (PDF+VCE)
- 350-501 Dumps (PDF+VCE)
- 300-510 Dumps (PDF+VCE)
- 300-515 Dumps (PDF+VCE)
- 300-535 Dumps (PDF+VCE)
- 350-601 Dumps (PDF+VCE)
- 300-610 Dumps (PDF+VCE)
- 300-615 Dumps (PDF+VCE)
- 300-620 Dumps (PDF+VCE)
- 300-625 Dumps (PDF+VCE)
- 300-630 Dumps (PDF+VCE)
- 300-635 Dumps (PDF+VCE)
- 350-701 Dumps (PDF+VCE)
- 300-710 Dumps (PDF+VCE)
- 300-715 Dumps (PDF+VCE)
- 300-720 Dumps (PDF+VCE)
- 300-725 Dumps (PDF+VCE)
- 300-730 Dumps (PDF+VCE)
- 300-735 Dumps (PDF+VCE)
- 350-801 Dumps (PDF+VCE)
- 300-810 Dumps (PDF+VCE)
- 300-815 Dumps (PDF+VCE)
- 300-820 Dumps (PDF+VCE)
- 300-825 Dumps (PDF+VCE)
- 300-835 Dumps (PDF+VCE)
Cisco CCT Dumps
- 010-151 Dumps (PDF+VCE)
Cisco CyberOps Associate dumps
- 200-201 Dumps (PDF+VCE)
Cisco CyberOps Professional dumps
- 300-215 Dumps (PDF+VCE)
- 350-201 Dumps (PDF+VCE)